Third Phase of I-10 Widening Between Phoenix and Casa Grande Begins on 11-Mile Stretch South of Loop 202
ADOT is adding a third general-purpose lane and an HOV lane each way; the full 26-mile project should be done by late 2029.
ADOT is adding a third general-purpose lane and an HOV lane each way; the full 26-mile project should be done by late 2029.